Anqing Hualan Phase II project cooling tower equipment procurement bidding competition announcement
Release time:
2024-07-10
The tender of this project is Anqing Hualan Technology Co., LTD., the tender project funds from the enterprise self-financing, the proportion of investment is 100%. The project has met all the conditions, and we welcome potential bidders with appropriate qualifications to participate in the bid.

The tender of this project is Anqing Hualan Technology Co., LTD., the tender project funds from the enterprise self-financing, the proportion of investment is 100%. The project has met all the conditions, we welcome potential bidders with appropriate qualifications to participate in the bidding, and the relevant matters are announced as follows:
First, Project name: Anqing Hualan Technology Co., LTD. 1000 tons/year liquid nitrile butadiene rubber, 30000 tons/year carboxyl nitrile butadiene latex, 10000 tons/year high solid styrene butadiene latex construction project cooling tower equipment procurement
Second, construction location: Anqing Hualan Technology Co., Ltd. factory, No. 8 Xiangzhang Road, Anqing High-tech Zone
Contents, scope and requirements of bidding
1. Bidding content: Square cross-flow open motor cooling tower: 800m3/h, 2 sets (for specific requirements, see the comparison document).
2. Bidding scope: Supply, commissioning test and inspection, trial operation, deficiency elimination, system acceptance, technical and after-sales service, personnel training of square cross-flow open motor cooling tower.
3. Completion time: Within 25 calendar days after signing the contract.
4. Quality standards: meet the relevant national and industry norms, prescribed qualification standards and bidding document requirements.
4. Qualification examination method: post-qualification examination.
5. Qualification requirements for bidders
1. The bidder shall be registered in the territory of the People's Republic of China, with independent legal personality of the cooling tower manufacturer or the brand of the cooling tower manufacturer of the project's only authorized domestic agents;
2. The supplier of the bidding content shall have the qualification and ability to complete the design, supply, installation (guide installation) and related services of the complete set of system equipment for the bidding content; The invested products shall have the production license, compulsory certification, marking certificate, product qualification certificate, product testing, inspection report, etc. that meet the requirements of the relevant regulations of the state and the industry (the bidder shall provide the corresponding qualification documents according to the relevant regulations of the state and the industry on the invested products and the requirements of the bidding content);
3. The bidder must have similar project performance in petrochemical industry in the past five years, and no major quality problems have been found in installation and commissioning;
4. The bidder and its legal representative shall have no criminal records of bribery in the past five years;
5. The bidder shall not have the business license revoked or the corresponding qualification (license, certification) certificate revoked (revocation, cancellation, collection) in the national enterprise (market entity) credit information publicity system, be included in the list of serious illegal and dishonest enterprises and within the penalty period, or have other circumstances affecting the bidding and performance ability;
6. The legal representative is the same person or different units with holding and management relationship shall not participate in the competitive selection of the same bidding project at the same time;
7. Joint bids are not accepted for the project.
Vi. Bid registration and acquisition of bidding documents
Registration period: October 13, 2020 - October 20, 2020 (8:00-11:30, 13:30-17:00 every day, Beijing time, except legal holidays and holidays);
The way to obtain the selection documents: This project does not issue paper bidding documents, bidders themselves with Anqing Hualan Technology Co., Ltd. project department to receive the electronic version of the selection documents.
7. Candidates shall be responsible for their own actions and bear the cost of bidding. The tenderer shall not assume any responsibility of the bidder in the bidding process and shall not guarantee the winning of the bid with the lowest price.
Viii. Bidding deadline and bid opening time
Submission deadlines and bid opening times for selected documents: see Selected Documents.
Ix. Place of bidding and bid opening:
Place of bidding and bid opening: Conference room on the third floor of Anqing Hualan Technology Co., LTD., No. 8 Xiangzhang Road, Anqing High-tech Zone. Selected documents delivered late or not delivered to the designated location will not be accepted.
10. Media through which announcements are made
This announcement is published on the official website of Anqing Hualan Technology Co., LTD.
11. Tenderer and contact information:
1. Tenderer: Anqing Hualan Technology Co., LTD
Account bank: China Construction Bank Anqing Shixian Road sub-branch
Account number: 34001686308053003353
Contact person: Pan Gong Tel: 0556-5256677, E-mail: 694471210@.qq.com
2. Procurement supervision and management Department: Huangshan Supply and Marketing Group Discipline Inspection Office Tel: 0559-2551035
Anqing Hualan Technology Co., LTD
October 10, 2020
Previous
Related News
No. 8 Xiangzhang Road, Daguan District, Anqing City, Anhui Province
Tel:+86-0556-5256677 / +86-0556-5326903
169 Yongjia Avenue, Huizhou District, Mount Huangshan City, Anhui Province
Tel:+86-0559-2184676 / 2184679

WeChat official account
Copyright © 2024 Anqing Hualan Technology Co., Ltd